Posted on January 23, 2026 at 3:26 PM by Troy Swanson
This document outlines the Pollution Prevention Plan (PPP) for the City of East St. Louis to comply with the National Pollutant Discharge Elimination System (NPDES) permit requirements. The primary objective of the PPP is to inform and engage residents about combined sewer overflow (CSO) issues. It details methods for public notification, including signage at overflow locations, public meetings, and communication through the city’s website and outreach materials. The PPP emphasizes transparency and collaboration with the community, ensuring they are aware of the impacts and ongoing efforts to address sewer system challenges.
PUBLIC ENGAGEMENT PLAN