East St Louis Illinois Homepage
Search

View All Posts

Jan 23

4 - PUBLIC ENGAGEMENT PLAN Long Term Control Plan Implementation

Posted on January 23, 2026 at 3:26 PM by Troy Swanson

This document outlines the Pollution Prevention Plan (PPP) for the City of East St. Louis to comply with the National Pollutant Discharge Elimination System (NPDES) permit requirements. The primary objective of the PPP is to inform and engage residents about combined sewer overflow (CSO) issues. It details methods for public notification, including signage at overflow locations, public meetings, and communication through the city’s website and outreach materials. The PPP emphasizes transparency and collaboration with the community, ensuring they are aware of the impacts and ongoing efforts to address sewer system challenges.


PUBLIC ENGAGEMENT PLAN

Comments

You must log in before leaving your comment

  1. City of East St. Louis

  1. 301 River Park Drive

  1. East St. Louis, IL 62201

  1. Phone: 618-482-6600

Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow